Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Transmission line design. Say, I have a 1MVA generator and
2 transformers that will have the same load. What would be
the proper rating of the trasformers? Is it safe to say,
that I will simply divide the total rating of the generator?

Answer Posted / k.prakashchandra

Each generator should have its own tr called UGT (unit gen
tr) for unit differential protection .The capacity of tr is
equal to or a little more than that of gen .

Is This Answer Correct ?    1 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Cables Construction hi friends, 0.6/1/1.2 kV LV , DC and Control cables are concentric copper conductor what does its means and what is the use of concentric copper conductor,and are this with copper tape shield or copper screening, ? thanks

1709


what is DRP panels?

2088


what is doubling factor in making current of a breaker?

2008


How we select the vector group of 3phase power transformer?

2640


What will be the diameter of pipe between conservation tank and transformer

1855


How to measure current and voltage in an ELV circuit

4089


Is neutral transformer can be called as control transformer?

1920


How to calculate the copper in HT motors if KW, RPM & Voltage is given

3146


Compare jfet’s and mosfet’s.

1206


What should be the percentage increase in length of the dead end clamp for bus bar conductor (Hawthorn) after hydraulic pressing and what should be the applied pressure?

1885


how to calculate the surge level of surge suppressors related to the SF6 cicuit breakers?

1928


How can we find the breaking capacity of a Load breaker switch (LBS) fed from 11 kv supply??ex:50KA, 26kA etc???detailed step vice answer pls.

1967


What should be the values of settling time, peak time, steady state error, overshoot, rise time, MPOS (Maximum percent over shoot) to keep the system in transient state, to keep the system in steady state ?

2200


What are the Formula of computing Back up Time of 500kVA UPS with 4 Battery Banks, each bank composed of 43 pcs of Batteries 12V150Ah. How to compute the Back up Time of UPS? We have also 3X500kVA UPS running in Parallel same composition as I write above.

1292


we use 400/5A ct and 35/roor3KV,/0.1/root3KV,0.1/root3KV pt ratio. What is the multiple factor of this meter.

1958