Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is the role and reponsibilities of Electrical
Engineers in construction field?

Answer Posted / srinivas.v

mainly he/she has to study the electrical drawing well and timely inspect that the electricians are doing accordingly.

Is This Answer Correct ?    13 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what reason of line current and phase current in star connection and line current and phase current not equal in delta connection?

2062


Explain about how is it working Earth fault'relay and wahts the resistance value of earth bed

1492


Is there any guideline say about display of earthing value near to earth pit

1174


I have 4 DG set with 1500KVA rating. system breakers are 11KV & alternator are 415 Volts. Between alternator & breaker one stepup transformer used. i want to Know what is max. resistance for body earthing & 415 & 11KV V Neuteal earthing. my fault current is 14 times for 2 sec.

2248


what is the main function of capacitors in mccs.

1707


IF % IMPEDANCE OF A TRANSFORMER IS INCREASED FROM 5.8% TO 8% HOW MUCH THE EFFICIENCY OF THE TRANSFORMER WILL COME DOWN?

2353


33kv substation lay out details & line to line & line to earth measurements

2591


sir i want previous entrance exam papers for written test

2106


what will happen reduce the transformer voltage from 415v to 406v, is it save the energy,? are this methodis good to reduce the energy.?

1487


how dose servo motor works

1880


how to calculate cable size in diffrent loads?

2038


distribution is maximum done by a)radial b)network c) parallel d)b & c

1980


hello friend i wish to study a course related to the electrical construction, controlling and monitoring , which course i want to study? pls give me the name of institute?

1762


surge tank, hrc fuse, earthing transformer, firm power objective type

1602


Hello everyone, somebody knows what is a "surplice power" ? The hole phrase is: "This rating is appropriate for a generator set paralleled with an infinite bus e.g. a national electrical supply network or grid where the generator set is run at 100% load, 24 hours a day, 365 days a year and any surplice power is exported into the grid" Thanks in advance.

1744