Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how to calculate 1:2:4 ratio concrete cement, sand, metal
and water please give me brief calculation

Answer Posted / aamir shahzad

ratio is 1:2:4 sum is equle 7
1 bag cement is equle to 1.25
total quantity resum is 200 cft
dry Volume of total quantity which is 200 cft to multiply
1.54 will be the value of total quantity is 308 cft.
which is the total quantity 308 multiply 1(which is cement
ratio)and divided 7 which is the sum of ratio it will
become 44 and now we convert cft to cement bag which is the
value of 1.25 for bag.

44 divided by 1.25 is 35.2 the Sum is 35.2 Cement of Bags.
same for sand. which value was came after dry
308 multiply ratio of sand which is 2 then divided sum of
the ratio which is 7 will become the value of Sand is=88 cft

for crash 308 multiply 4 which is the value of crush and
devided by sum of value which is 7 total sum will become
176 cft.

Total sum of quantity of 1:2:4 mean.
Cement=35.2 Bags
Sand= 88 cft
Crush= 176 cft

These are right answer.

Is This Answer Correct ?    48 Yes 17 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How much of fly ash is allowable in Portland cement and what is the disadvantage when the level of fly ash is increased?

1763


What is the meaning of Brick- M 35 grade? Is it a common brick or it's a concrete brick?

1845


Coverage of 25mm.thick ratio of 1:4 cement mortar?

1855


What is the use of extruded feature in solidsworks?

1175


what is the water-cement ratio of mix design while 30mpa in 7 days?

3004


how to calculate valuation for the old building?

2320


Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?

1767


I need to do a Compressive Strength Test for a specimen made of Rubber. Before doing the Test on the Machine, I need to have an idea of the Minimum and Maximum Compressive Strength or Yield Strength of the specimen. How can I calculate that?

1694


Civil engineering material testing Standard results

2303


which steel is better for residential building tmt steel or hysd steel

2203


what is pile and deam foundation

2272


Where will be the maximum bending moment in a TEE Beam?

7413


what is polity

2039


Please tell me any one, how many quantity concrete paver block fixing perday ( 8hours) per mason??

1623


Form where IS456 is adopted in 1978?

1918