how to calculate 1:2:4 ratio concrete cement, sand, metal
and water please give me brief calculation
Answer Posted / aamir shahzad
ratio is 1:2:4 sum is equle 7
1 bag cement is equle to 1.25
total quantity resum is 200 cft
dry Volume of total quantity which is 200 cft to multiply
1.54 will be the value of total quantity is 308 cft.
which is the total quantity 308 multiply 1(which is cement
ratio)and divided 7 which is the sum of ratio it will
become 44 and now we convert cft to cement bag which is the
value of 1.25 for bag.
44 divided by 1.25 is 35.2 the Sum is 35.2 Cement of Bags.
same for sand. which value was came after dry
308 multiply ratio of sand which is 2 then divided sum of
the ratio which is 7 will become the value of Sand is=88 cft
for crash 308 multiply 4 which is the value of crush and
devided by sum of value which is 7 total sum will become
176 cft.
Total sum of quantity of 1:2:4 mean.
Cement=35.2 Bags
Sand= 88 cft
Crush= 176 cft
These are right answer.
Is This Answer Correct ? | 48 Yes | 17 No |
Post New Answer View All Answers
I am a civil engineer . I am also selected for sbi clerk interview which is to be held on 4th May2010 is there anybody resembling the same? what question can be asked and what should be the probable answers?
load combinations how many types for staad design purpose?
How to calculate carrying capacity of the existing water supply trunkmain
in staad ,why we realease a moment of a member ? what is affect if we realease a moment
What is the withdrawal force of steel nails?
How will drive weight formula for circular cylinder steel bar in kg/ m please step by step drive?
i have four storeyed rcc building.basement of the building is around 34 years old.it does not have pillar support.it is having lintel steel support at every 7 feet of construction. how long this building will lost long . can any body help me in this regard
rimmer in pile foundation
what is escalation?how it is done?
how to calculate the mortar for 10'*10' size room for both plastering and for masonry work?
will fix foundation bolts at site with out template is there any procedure?
in plate load test what is the thickness of plate 20mm 5mm 50mm none
Did any of the egyptian pyramids ever fall down?
what is the theoritical percentage of concrete cubes testing per day?
please what are the required bars for a beams of 6mx6m and 450x300mm, one is continuous and the the second is discontinuous ..Its a commercial building (church)