Yes required,
Lighting arrester means it will arrest the surge voltage
caused by lighting, and it must be installed at the top of
the building to safe gaurd the building from heavy (surge)
voltage, if the Lighting arrester is not earthed properly
high voltage will damage the building so that proper
earthing is neccessory to safe grounding of surge voltage.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
is the value of inductance depends upon the evalue of thitha in doubly excited machine?
Earth bits close or open. Which is correct
why swinburnes test cannot be performed on series machines?explain
The gauge indicates the number of amps, but what about voltage? How voltage rating (for wire or fuse) determined?
pls tell me about ups internal connection & we have given only 3 phase supply to ups system how get 4 wire (R Y B N )
do we use neutral grounding for resistive balanced load? if we use what happen?
How to determine the breaking capacity such as break down current and break down voltage for VCB and CT's.
What's the difference between non break power supply and non break non short break power supply
how to differentiate a mpcb,mcb with a contactor? Explain their working operation
We have two parts in generator, electrical & mechanical. how it works?
Can we use 230VAC, 63A MCB for 120VAC, 63A supplied heaters load?
Why do not we prefer non conventional sources of energy to conventional sources?
working principle of oil startar
what clearance required for 4.5 mva dry type transformer?
Write down the brushes of a de machine.