How we calculate the cement for the M 15 normal concrete with
aggregate size is 40 mm ?
Answer Posted / n3
for M15 proportion is 1:3:6
assume wet volume 1 m3 of work
to produce 1 m3 of wet volume we need 1.54 dry volume
cement qty=1.54/1+3+6=0.154 m3
hence no of bag=0.154*1440/50=4.44 nos
sand qty=0.154*3=0.462 m3
agg qty=0.154*6=0.924 m3
40 mm is max size of agg & it is the std value
| Is This Answer Correct ? | 4 Yes | 10 No |
Post New Answer View All Answers
What glue is least sticky?
how to check and keep control on the wastage of material at site
What do you mean by honeycomb in concrete?
Explain major differences between routing maintenance and major maintenance.
Explain what is alternate bid?
How reactor of SBR installed , is it be over ground, fully under ground or semi sunk ?
What are the different softwares used for cad?
Prepare a Schedule for a Highrised building from starting stage to Handover?
important question on stones
material used for mendrel use to bend epoxy coated rebar
how u design STAGING for Superstructure in BRIDGE construction?
What are the materials used in building a gravity dam?
How do you prepare Material Recovery Statement for deduction from contractors bills?
punj loyed and sapurjl palanjl
Bernaullis theorem deals with the law of conservation of mass momentum energy none