A group of machines (wind turbines) connected with 33KV
feeder and each machines are having individual VCB. The 33KV
feeder connected with 110KV/33KV substation. The 33KV feeder
tripped by over current at Substation and fault recorded at
Substation as OC-R&Y phase. Same time the group of machines
VCB tripped by over voltage, the fault recorded voltage was
above 66KV by numerical Under/Over voltage relay. While grid
drop time, this much of voltage hike is possible?
Answer Posted / k.prakashchandra
The load throw-off may result in run-away speed being equal
to twice the normal speed ,hence the voltage may also become
twice. Over voltage relay should be set at not more than
120%.You can employ the AVR so that the voltage does not
increase with the speed.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Please brief me about number of pole in alternator.In single phase alternator coils are connected in star or series. How to calculate frequency for the same.
If I want to connect a capacitor bank on the HT side of a 11kV/415V, 3 phase delta-star distribution transformer to supply Reactive power to it..what practical specifications of a Capacitor bank that can i've??please reply..
Why using synchronising methed in DG's sets?
how does a liquid starter reduce the starting currents?
in single phase converter, the no.of scr's conducting during overlap a)1 b)2 c)3 d)4
Is it required to lay GI wires along with GI/MS conduits from one point to another point though separate earthing cable is conncted from DB to Socket?
What is the difference between single core 2 wire and single core 3 wire system? Which application we are using this? and for What purpose we are using this?
How to run a three phase motor into single phase........
how we provide neutral earth on synchronising panel as per electrical standards?
I want to merge a cable..in between two metering Cubicals which contains CT's and PT's and Energy meter..before taking merger..what are the common things required?
What is the role of feedback in a closed loop control system?
dc supply given to dc generator winding.how is possible? my knowledge is saying the winding will burn. please reply.
Do closed loop systems require manual input?
along with technical test papers
What is inrush current? how can calculateit? what is the affect of it?