Answer Posted / rm
FAILURE OF CT PT
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is the tension required for the 25000 CFM AHU belt
the problem faced on star or delta winding connection??
what is the maximum permissible limit value of leakage current and leakage counter reading to replace lightining arrester?
when we decide to use soft starter drive or vfd drive in mcc to operate apump?
What is super thermal power plant? and how it will differ from normal thermal power plant
what is submersible pump?what is different between motor and sub motor?
why T/F winding temp measurement cts are odd secondary current ie,109A/1.2A/1.4A?
what kind of technical test that i need to learn because i have an interview tomorrow.. please someone help me..
Define delay time.
im working in one private compeny in gujarat. i was complet diploma electric in 2010 from gujarat technical board. now i want electric supervisor licence in gujarat but i dont't know when i apply? plz give me address of the licence dippartment office in gujarat. gandhinagar
what is differentila pilot supervision in the incomer control panel in the power station?
Why are short circuit ratings always 16kA,25kA,36kA and 50kA.Who has fixed these?
what is the purpose of using filters in a protective relaying scheme?
what is the correct format to create a resume for interview??
Write a note on materials used as a fuse element.