Pls. help.
If a contract was awarded to a contractor in april 2012 with
steel & cement base price as rs. 45/kg & 250/bag. Now in
oct. 12 steel cement price becomes 55/kg & 290/ bag. How
escalation will be calculated? Pls. tell complete calculation
Regards,
Answer Posted / jai
The prise quoted by us in the BOQ wil be the finel prise...
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
How to calculate the crank rod in slab
How to construct a water sump in a rocky soil?
Why is concrete cube test carried out?
What is the difference in painting using Roller and Brush? What is the paint consumption difference? As per IS one coat of painting is painting from left to right and top to bottom whether this can be done using roller ( Roller Stick height and feasibility) ?
How to make a c++ program that converts any base to base 10?
In the present situation of ban on mining sand from rivers,can we go for formation of earth dam filters viz;Horizantal sand blanket,inclined chimney and filters under rivetment with crushed rock sand of 6mm down size.If so what are the specifications and is there any codal provision for its authentication?
What is the significance of cost estimate knowledge for an architect?
how we can find sieve #4 is 4.75mm?
How and where are aqueducts built?
What is the meaning of Brick- M 35 grade? Is it a common brick or it's a concrete brick?
Explain the difference between shear and tensile strength.
What is the effect of a building collapse?
what is kribs is supporting?
how we calculate the grade of the Bituminous materials.?????
What are the benefits of rcc pipes over steel designed pipes?