Pls. help.
If a contract was awarded to a contractor in april 2012 with
steel & cement base price as rs. 45/kg & 250/bag. Now in
oct. 12 steel cement price becomes 55/kg & 290/ bag. How
escalation will be calculated? Pls. tell complete calculation
Regards,
Answer Posted / jai
The prise quoted by us in the BOQ wil be the finel prise...
Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
Special thing in designing a overhead reservoir ? which is different from an ordinary design
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
how to find the cement bags and sand requirements for the one square meter of internal,external,ceiling plastering by using the various ratios like 1:3,1:4,1:5,1:6
Design a rectangular channel.
Rate analysis of 150mm, 100mm, & 230mm thk BBM work
Kindly post me previous year interview questions with answer for post of Manager (civil engg.) for NTPC, IOC , GAIL etc. I have interview on july 2013.I will be very grateful to you. Please guide me.
What is the difference between Fe 500, Fe 500 D and Fe 515.
Name the main components of a cad gui?
115mm thickness brick work how to required mortar
What goals do you have in your career?
what is the water-cement ratio of mix design while 30mpa in 7 days?
how many mason and labaur work for a 1 brass bricks plz let me know the calculate & how to made calculation for this and whats the formulas for this?
If we don't have drawing for Excavation of building,At what rule we will go for excavation and how much depth will go for a villa?
What are the causes of building collapse?
TO CONSTRUCT A 1800 SQFT CAPACITY UNDERGROUND WATER TANK HOW MUCH CUFT CONCRETE IS REQUIRED AND HOW MUCH REINFORCEMENT IS REQUIRED. FOR COSTING