Pls. help.
If a contract was awarded to a contractor in april 2012 with
steel & cement base price as rs. 45/kg & 250/bag. Now in
oct. 12 steel cement price becomes 55/kg & 290/ bag. How
escalation will be calculated? Pls. tell complete calculation
Regards,
Answer Posted / jai
The prise quoted by us in the BOQ wil be the finel prise...
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
what is box type waterproofing and how it is exsiccated and what is the method of doing box type waterproofing
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.
Sir how to find cutting length for footing steel bars in the shape of "u"
Can anybody explain with the help of sketeches that what are 2legged , four legged & 6legged stirrups and how to calculate cut length of diamond ring(stirrups)?
How many bricks are there in 100cft?
What is the difference between Hinged and pinned in Column ends
How to convert 20 dia bar to 16 dia bar in beam without reducing the steel weight
how much shouid be the rate for ready mix concrete per cubic meter
What is structural frames or systems?
How many days should curing of plastering, brick work and concrete
how to reduce size of column 450 x 750 to 230 x.... if it is cut in area of bathroom? means it appears in bathroon any shifting or any other option....building is g + 10 and the bathroom is at first floor...
What are the ingredients of pre-stressed concrete?
what is cross hair cursor?
How can you distinguish between sorption, absorption and adsorption?
How about the temperature of grade 35A concrete? Does it depend on the ambient temperature?