there is a # KVA Transformer of 11 KV/440V, in simple(not use formuia) how can you calculate it's HT & LT side current.
Answer Posted / guest
HT side current = #/20 LT side current =#+#/3 ie 100KVA 11KV/440V transformer it's HT side current = 100/20=5 amps LT side current=100+100/3=133 amps. this is approximatelly figure(answer), Line man of Power Distribution Company fallow this method .
| Is This Answer Correct ? | 8 Yes | 6 No |
Post New Answer View All Answers
please tell me, how i clear the objective test? when i studied form the one book after i solved the objective ,that time i solved that qes. but if i tried solve objective form the other book then i could not solved these que.
use of PIR in ehv breaker
Showing results for capital, machinery, stock,wages, carriage in words, salaries, factory rent, repairs, fuel and power, buildings, debtors, sales, purchases, creditors, return outwords, return inwords, drawings, discount allowed, discount receivable, office expenses, bills payable, bills receivable, cash in hand, cash at bank, office rent comes under debit or credit
Pl.brief me about Electrical power distribution system from Main generating station to Industry.What is the use of in between station.
I have motor 1500 HP and , 4160 V , 60 HZ , then i need the rating of transformer which can feed that motor ??
what is the differebt between ac and dc fuse?
I want single line diagram for AMF & DG syncronizing panel
What is the effect of solar radiation on the design of an Isolated Phase Busduct?
How test for Ddo vector group test condition?
How to justify this statement ??? "Capacitors in series provide less capacitance but higher voltage breakdown rating for the combination"
typically in power distribution substation. 1- Any idea how would be the graph of capacitor bank consumption verses time through the day . 2- How is the switching ( on and off ) of the capacitor bank, per need?
What is the diff. between single compression and double compression gland
distribution transformer de-rating formula on over limit iron losses
describe the Tranformer testing procedure
- two pumps must work with them at the same time but if the first pump start the second pump must delayed for some time to start also , with motor rated power = 90 KW and rated voltage = 380 V and rated power factor = 0.85 lag please draw the power and control circuit for it and determine all circuit components parameters that you use it