why we use 3 phase in our country?..why no 4,5 or 2??
Answer Posted / pradyumna chandra panda
In 3 phase supply phases are120 degree electrical aparts each and for a technician it is easy to use such connect the machine with sequence or obtain uniform rotating magnetic field in motor, so India follow this.
Is This Answer Correct ? | 17 Yes | 5 No |
Post New Answer View All Answers
we have 15 ampere variyac but we want 30 ampere variyac what we do
what is difference between isolation and ultra isolation transformer?, what is the method of testing ?
hi, in the event earth grounding is not available in a project, is there any other way to make the elcb work? fyi, i have an instant water heater (6.5kw) installed, however if there is grounding in the heating element inside the heater assembly, i will get grounded. thank you in advance to those who will answer my question.
How good are you in resolving the commercial issues to Employer's advantage?
what is the reason for indication of light in the earth lamps of main switchboard.if there is an earth why does one lamp get dim and the other two bright.
my UPS suddenly goes off and all panel light also blow off.This happens even main electric supply is not interrupted.After some time it automatically starts functioning normally.Batteries are new.
RESPECCTED SIR/MADAM- I AM PRERING FOR SECTION ENGINEER (ELECTRICAL) RRB CHANDIGARH PLEASE SEND ME SOME PREVIOUS YEAR QUESTION PAPER OR MODEL PAPER.MY EXAM IS ON (30- NOVEMBER 2008).I AM VERY THANKFUL TO YOU. FROM- HARENDRA SINGH YADAV
for 750 kw LT load what will be the ht kva
Application Comparison between 22KV (UE)and 33KV (E) system. Are we allowed to use 33KV (E) cable in lieu of 22KV (UE) cable. What are the technical disadvantages.
how to calculate vfd o/p voltage by frequency
Transformer cores are laminated in order to A simplify its construction B minimize eddy current loss C reduce cost D reduce hysterisis loss
What are merits & De-merits of State-Space Method? What is series programming, parallel programming, general programming & direct programming ? And, difference between these programmings Techniques ?
standard earthing rating for power line..
what is 3rd Harmonics? how it is generated in alternator
What is current & voltage ? Voltage perform at any load without current or not?