Pls. help.
If a contract was awarded to a contractor in april 2012 with
steel & cement base price as rs. 45/kg & 250/bag. Now in
oct. 12 steel cement price becomes 55/kg & 290/ bag. How
escalation will be calculated? Pls. tell complete calculation
Regards,
Answer Posted / viswanadhamklvs
Generally the PVC formula will be given in the Contract
document itself. The month in which the contractor quoted
his bid will be considered as Base month. The indices for
the commodities will be published by the office of Economic
Adviser in the web site eaindustry.nic.in. These index
values shall be substituted in the formulae given against
each commodity viz., steel and cement. In the same fashion,
labour component also shall be considered based on the index
value given by labour Beuro of India.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
procedure for preliminary selection of size of column of 5 storey building
how to conversation of all construction material in to brass
what is the use if we fixed butterfly ties in column and masonry work joint?....where we have to fix(distance)..
Why Is Propping Required For Long Structures Once The Form Work Is Removed?
What is the snap size in civil and how can we create it?
What is thumb rule in quantity and cost estimation of a residential building?
how to find hardness of water?why it should be determined?
Please tell me any one, how many quantity concrete paver block fixing perday ( 8hours) per mason??
what is the procedure involved in preparing mix design of m15 grade as per IS-10262-1982
Please Clear My doubt . We Can Design the size of the beam by manually by the Length of the beam...What is the technique adopted
the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm
115mm thickness brick work how to required mortar
What is Refuse Area In High Rise Building ?
How many days should curing of plastering, brick work and concrete
Why are steel plates inserted inside bearings in elastomeric bearing?