Answer Posted / niville ho
It can be classied into different ways
and there are not absolute answers.
My answer is two types:
1. Demand-driven MRP
2. Teamwork MRP
| Is This Answer Correct ? | 0 Yes | 5 No |
Post New Answer View All Answers
Mention what are the t-codes for creating, changing and summarizing bom?
What is Planning time Fence?
what are the settings needed for variant configuration?
Explain PI sheet.
Can't one material be assigned to more than one operation in a routing?
What is golive actually? What is the role of a functional consultant in golive actually?
What are the key fields in MRP views?
In lsmw which is most important step?
What do we do in realization phase?
Difference between Item categories or what is variable size item or non stock item.
In cost controlling information system mention the fields that are listed in the list screen of the report?
Integration between PP and MM Module.
In lsmw which is the most important step?
What is Auto GR?
Explain what is the need of mrp list if the stock requirement list is already given?