Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How can we calculate the Rating of DG Set for a 4 kw motor?

Answer Posted / samarpal singh

1.5 time of motor capacity

Is This Answer Correct ?    2 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is the difference between RMS & TRUE RMS VOLTAGE

2953


what is the power rating of CPU, CRT type moniter, LCD type moniter,scanner Approx.

2200


hi frds, i m electrical engineer.can i get cdr for electrical engineer if u have then send me on my mail id its jayesh_ee88@yahoo.com.please help me frds

2194


what are the range of memory address in plc for L&T lx7 4A

2324


what is the Connected Load (kW) or Contract Demand (kVA)of mahindra nasik plant??

9493


hi every body i am master student in control engineering and my project is slip control in trains i assumed a Dc motore as traction motor but i don't have characteristics of this kind of motor that is used in train. i want from every body if he or she has the characteristics or information about Dc motor that is used in train give me those information or technical characteristics .

1493


A 7 storey building has a floor area of 35,000sq.ft on each storey. On the ground floor 11KV electrical sub-station is to be erected. A load of 3kw for every 400sq.ft (p.f is 0.8) is proposed for each floor. fire pump 7.5hp, water pump 5hp, lift 2 nos, each 10hp and 20shop load of each shop is 5kw. calculate a. load each floor b. total load of building c. L.T feeders for aech floor and from transformer to main. d. distribution diagram e. capacity of sub-station/capacitor bank f. line diagram

2816


what is per unit calculation?looking for simple and strong explanation thk u

2565


What's the difference between non break power supply and non break non short break power supply

1445


What are operating procudures & Safety precautions to be observed while operating OLTC in manual mode ?

1970


It is desired to flood light the front of a building 42 meters wide and 16 meters hig.Projectors of 30 degree beam spread and 1000 watt lamps giving 20 lumen/watt are availabl.If the desired level of illumination is 75 lumen/m and show a suitable scheme.Assume the cofficient of utilization, deprecitation factor and waste light factor are 0.4, 13 and 1.2 respectively.

3885


hello friends..... any one have papers or any study materials?sail ,hpcl...?

1886


List the disadvantages of constant k filters?

1670


i m doing DEEE in part time,can i join regular cources in BE,,IF i join what the cources can i select like (civil,ece,IT) ,,kindly advice

2109


how to select energy meter? have any calculation?