Answer Posted / navneet shukla
production planing and control
| Is This Answer Correct ? | 2 Yes | 3 No |
Post New Answer View All Answers
Maximum cement content in 1cum for RCC and PSC? (please give IS,IRC referance?
what is the water cement ratio? how to calculate it? list the wt. of constructions materials including concrete both ordinary and light wt. concrete
How many Rod required for 58 feet by 24 feet roof slab which is supported by 5 * 3 = 15 Column. Six Stored building Roof Slab = ? Ton 15 Column = ? Ton Slab Beam = ? Ton
hi, i am appearing in HPCL(CIVIL ENGG.)exam. plz send me placement paper of this exam if u are having
why demand factor less then 1 ?
what is difference between GTS bench mark and temporary bench mark
Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??
how to prepare site mix design
how much of quantity of material required for execution of one cubic meter of random rubble masonry in 1:3 cement mortar
Why are steel plates inserted inside bearings in elastomeric bearings?
In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.
at what pressure ply-wood is obtained by gluing wooden sheets
How much quantity of cement,sand,stone used to build 1 cum of cc road??
what is pqc
B.M DIAGRAMS & S.F DIAGRAMS OF CONTINOUS BEAMS