For Beam steel reinforcement detailing, in the End of the beam do the making of L shape in the rebar is essential in all the cases, specially in the ends of the Beam?
Answer Posted / mdnahid akhtar
it is compulsory to do bend in the end rregion of beam,because the maximum chances of deflection is always near the sopport.in some cases the concrete leaves the rib of steel,called sleepage. so to avoid the sleepage and to increase more tensile strength doing bend (L) is necessary.in cantilever no discussion .but in S.S beam it may run.
| Is This Answer Correct ? | 12 Yes | 0 No |
Post New Answer View All Answers
manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.
Form where IS456 is adopted in 1978?
Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required
What is the coeffiencent Friction Angle between Steel and Ashphalt?
what is pile and deam foundation
Calculation of curtain wall of box culvert
how water proof chemicals act in concrete to avoid leek?
how we calculate the grade of the Bituminous materials.?????
What is the difference between absorption & adsorption and sorption?
what"s the sort of beams?
What is a hatch patterns?
List out some of the software used in the construction sector to estimate cost and monitoring expenses?
Why should you show Client/Engineer activities clearly on the project plan?
material required for construction of 1cu.mtr wall (Cement, No of bricks (Brick size 40cm x 20cm x 10cm),sand,Quantity of water
I would like to get the formula How can i calculate the productivity of a mason in terms of brick laying and plaster. i have 6000 Sqmt of interlock laying work i want to calculate - how many masons required to do the job - in how many days can it be done - what will be the production rate in 8 hours shift/ per mason if i can get some excell sheet , it will really help me in my calculations