If we have 15000kw connected load in a factory than how much
power demand sanction should be taken from electricity board.
Pls provide complete calculation.
Answer Posted / ashish negi
the above calculation is correct but if we have to give our
demanded load to electricity dept. than the load should be
greater than the load as on starting motors , motors take 2-
3 times the full load cureent and at that time your MDI
(maximum demand index)will go beyond the calculated load.
so in that case your have to pay the penalty. so your
demanded load should be between 2500-3000 KVA.
| Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
what is gridrotor resistance starter
What is boucholz relay and the significance of it in to the trformer?
What is the effect of interchanging core(made of steel) and winding(made of copper) material in case of transformer? Give proper explanation in regard to different losses in transformer.
Bimetal strip used in overload relay what is that,which types of material used for that & percentage.
Why 15Amp. MCB is suitable to carry load of 1.5Ton Ac please Explain?
Who are the manufactures those manufacturing 3Cx2.5sqmm FRLS cables. I heard about FRLS technology adopted only in wires useful for wirings
What is core CT & it's function?
Why synchorised generators are used for the production of electricity?
why does connected a indutor with mnsformeretering core of current transformer ?
The shot circuit in any winding of transformer result? Explain
How can you sized or estimate the ligthning arrester current rating?
How to find out damper winding failure for synchronous machine?
what is transformor oil gread
Explain about retrofitting of machine tool.
Why is the frequency not changed during transformation of electrical energy in a transformer?