how to caculate cutting lenght in bar bending schedule for
180 degree bend

Answer Posted / vinod kumar, sriharikota

GENERALLY 90DEGREES BEND IS 2D, 180DEGREES MEANS IT IS STRAIGHT BAR THE CUTTING LENGTH IS TAKEN INTO ORIGINAL LENGTH OF BAR.

Is This Answer Correct ?    5 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is total volume of ingredients used in concrete accordingly

1814


At what point does a circle start losing area when being flattened?

640


how many sqft or cft of work done by a mason per day in all works such as brick,block,concrete,shuttering carpenter,reinforcement fabricator,painter,door window carpenter.....everything thank you

1514


List out some of the checking’s, done at the completion of construction?

718


can i get hindi version of is codes based on civil engineering?

3892






Draw the cross section of a boundary wall and label its part with detailing?

4158


what is grade intersection?

1614


what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?

4472


 What is difference between limit state and working stress method? How it is applies in building structure.

1781


Rate analysis of Vitrified tile in cement mortor 1:3

3943


i have boiler of 35 tone and wanted dig out foundation is there any body to help me to carry out calculation for the foundation like

1555


insted of bentonite we can use any alternate material in piling ?

1715


residential projects,structural.

2417


how to design and calculate materail quantity for concrete speedbreaker ?

5396


WHAT GOAL DO YOU HAVE IN YOUR CARRIER?

1886