Answer Posted / sandip
UP TO 10 OHM IT IS OK
| Is This Answer Correct ? | 0 Yes | 3 No |
Post New Answer View All Answers
PLZ EXPLIN ABOUT CLASS PS CLASS CT .WHY THEY R DESINED AND FOR WHAT PURPOSE?WHY OTHER CT CANT BE USED AS PS CLASS CT? EXPLAIN IN SIMPLE LAUNGAGE IF POSSIBLE PLZ GIVE CIRCIT DIAGRAM?EMAIL-RAJ_SINGH_0376@SIFY.COM
IN dc capacitive reactance is??
What is cut-off rate?
Benifits of 3ph 4 wire metering over 3ph 3 wire
what is the importance of Partial Dischage test for Electrical Equipments
what is per unit calculation?looking for simple and strong explanation thk u
how the B-H loop obtain under the static condition
Given a collection of points P in the plane, a 1-set is a point in P that can be separated from the rest by a line; i.e. the point lies on one side of the line while the others lie on the other side. The number of 1-sets of P is denoted by n1(P). The maximum value of n1(P) over all configurations P of 19 points in the plane is 18
What is Annunciation?
tell me some type of questions throught which i can prepare for exam and do my best
sir, what is the importance of Fault MVA. how to calculate fault mva of 33kv substation connected by 6.5 km line(single circuit with equal spacing) with 110/11kv transformer in 110kv susbstation.the fault mva on 11 kv bus in 110kv susbstation is 208mva.
how can calculate resistance box for 15 kw, 6 pole, RV-230, RA-42 motor
what is difference between isolation and ultra isolation transformer?, what is the method of testing ?
A generating system will have a total capacity of 300 MW. Find the probable forced outage when the capacity is supplied by two 150 MW units. The operating probability of all units is P=0.98 and forced outage probability rate Q =0.02 .
some time we open engine breaker 8.0 MW load but plant not trip. and another time engine open 4.0 MW load engine trip why? individually engine breaker open & individually emergency stop why difference?