how the lap length is calculated in reinforcement of 110mm
dia steel of Length 15.00 mtrs. & grade of concrete is M20
Answer Posted / akshaya kumara nandi
I think it is fifty times of diameter of TMT bar
so it is 50 x 10mm =500mm.
| Is This Answer Correct ? | 11 Yes | 0 No |
Post New Answer View All Answers
What black man invented the clothes dryer?
Formula for calculating the volume of bulb in underreamed pile
In cement concrete how to check a quality of material also proportion of material at site ?
What is reinforced concrete?
Thumb rule for steel qty for 1m2 in kg/m2 column slab footing beam
What is the Unit weight of coarse sand (F.M- 2.20) ?????
Differentiate first angle & third angle projection?
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
Is it necessary to apply tack coat over the primecoat. IF not what happens.answers other than 1.to superimpose the next layer(2) to adhere the layers so as to form homogenity.
though u r a civil engineer, y r u interested in tcs???
brickwork labour rate per cum ?
How to estabilish reinforcement Steel rolling margin for a building projects ?
what is column foundation
how i can calculate the actual nos & size of steel to make 1000sqft. x 3"thick slab
Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.