Answer Posted / arun
when the rod is 12.12M .but length of building height is
higher than 12.12m we are provided in lap length.
it is depending upon the rod diameter.
| Is This Answer Correct ? | 2 Yes | 2 No |
Post New Answer View All Answers
What is absolute coordinates?
Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No. Loading Axial force Moment Shear 1 DL+LL 1950 600 20 2 Seismic load 250 4800 700
what is mean by c32/40s concrete class
how i can calculate the actual nos & size of steel to make 1000sqft. x 3"thick slab
What is the effect of a building collapse?
Which is the latest version of solidsworks?
the volume of cement req for 70cum of brickwork in 1:6 cement mortar is approx is equal to 3cum 5cum 7cum 1ocum
What is the difference between the concrete mix design carried out by IS10262 and by ACI method ?
Explain moment of inertia?
how to do cementicious paint for rcc walls of cw pump house
I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.
how much st. steel is required for staging of concourse slab of a elevated metro station allowing through traffic .
How to convert 20 dia bar to 16 dia bar in beam without reducing the steel weight
What in your opinion makes you the most suitably qualified candidate for this post of civil engineering technician?
what is the procedure of wet seiving. n percentage of silt in different type of soil?