Answer Posted / arun
when the rod is 12.12M .but length of building height is
higher than 12.12m we are provided in lap length.
it is depending upon the rod diameter.
| Is This Answer Correct ? | 2 Yes | 2 No |
Post New Answer View All Answers
Specific gravity of cement?
What are the advantages of cad?
Exterior Joints,define
The portion of a brick cut across the width is called?
how to calculate freeboard in under ground water tank and technical details
How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)
What is the exception critarea of cube?
What is factor not to be taken in consideration in mix design?
how to prepare site mix design
what is mail role & relationship between senior Civil engineer to consultants , Construction manager ,project manager, project engineer ,Technical engineer & qa/qc engineer ? what is the responsibilites of Senior Civil Engineer?
Calculate the maximum allowable speed on a horizontal curve of radius 350m if the maximum allowable values of the lateral coefficient of friction are 0.14 and the rate of superelevation is 0.08.
Define What is Civil Engineering?
how to calculate the dry wt of sand and cement for a required design mix?for ex:M20
resins are not soluble in water soluble in spirit used in varnish left behind on evoporation of oil
Stringer How many cm goes to landind