how to calculate rate analysis of M25 grade concrete
Answer Posted / amit dutta
m 25= 1:1:2.
there ore ratio is 1+1+2=4
we know one cub dry volume is 1.54.
there fore cement require,
1.54*1/4=0.385=11 bags cement for 1 cub m.
sand =0.3858*32.28cft = 12.45 for one cub m.
stone chip 0.77*32.28cft = 24.85 for 1 cub m.
| Is This Answer Correct ? | 58 Yes | 40 No |
Post New Answer View All Answers
20mm thick sand face plaster on walls consisting of 12 mm the backing coat of c.m.(1:3)and 8mm thick finished coat of c.m.(1:1)including scaffolding, watering, finishing etc complete please calculator with methyl et et r u
What is construction mitigation management?
If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?
How to arrive d*d/162 , for finding the kg per meter , wt of steel
What do you mean by tolerance factor of concrete ?
What is the name of this multiplication factors ?
Why should appointment store person for project ? what is the benefits for company ?
Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting
How do we calculate absolute pressure?
why we are useing plastic under the lean concrete?and whts the advantage?
What is the cemnent ratio
Draw a neat sketch showing the 'throat' of a welding in a plate girder ?
we want build 10ft height ,tostore 4 litresof water.what is theground basement for steel andcement andsand.please send us basment calculation?
why we can use dust in concrete insted of fly ash
std penetration resistance in very stiff clays lies bet 2 & 4 4 & 8 8 & 15 15 & 30