how to estimate the earthwork,earth-filling for an isolated
foundation
Answer Posted / kumud ranjan jha
Excavation > is l x b x h
but filling is total excavation - pcc-rcc of footing up to NGL
Is This Answer Correct ? | 7 Yes | 1 No |
Post New Answer View All Answers
3. What are the disadvantages of your present job, things you do not like about it?
why we use for testing of compression strength concrete the size of specimen 150x150x150. why we are not using another dimension like 100x150x100 uneven dimension.
What the advantages and disadvantage of using 90mm and 100mm bricks for a wall of a house? Thanks for any input.
Define What is the tallest man made structure in the world?
how to find quantity of concrete in PCC M15
Hi how r u ? hope you are fine there . Please can u tell me tha Design life of Buildings as Per ACI CODE 318-99. It will be a pleasure for me .Thanks in advance
In cement concrete how to check a quality of material also proportion of material at site ?
pls mail some more tecnical qustions at msaranya2610@gmail.com
Why was the empire state building made of steel?
In few lines, please be elaborative on extras and talents that make you a potential candidate for the post:
how many numbers of 4inch bricks and get consumed in 9 inch BB masonary wall in cubic feet.plz send my below e.mail adress
What is unit weight of roadway layer.. 1.bitumen 2.sand 3.soil 4.concrete 5. aggregate give me some reference for this answers
in staad ,why we realease a moment of a member ? what is affect if we realease a moment
How to use of me trial wall plaster 6mm , 10mm par sqm. use in sand and cement ?
what is floating slab foundation?