How to calculate lap,bond and hook length for preparing bar
Bending schedule ?
Answer Posted / lalit kumar singh
Lap lenght:- for liquid structure- 50d
for another structure-40d
(like column, beam, slab)
For stirrups Hook:- 2x10d
for corner bend :- (-3d) upto 12dia.
(-4d)above 12dia.
| Is This Answer Correct ? | 51 Yes | 22 No |
Post New Answer View All Answers
which are the Indian auther books for STONE COLUMN/GRANULAR PILES?
What is the Unit weight of coarse sand (F.M- 2.20) ?????
How many hours should traffic be not allowed after completing wbm road or bst.and min how many hours should road rollers be used.
. Write a C program to perform following functions:- a. Declare one integer variable of all the storage classes. b. Print all the variables without assigning any values in tabular format. a. The tabular format must contain the variable name, type, storage class and printed value on the screen in RED color.
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
by which materials we can prepare circular shuttering with tentative cost of material(rate analysis)
PL.tell me about civil engineering questions with answer
what is the difference between np2 and np3 concrete mix
what is the design procedure for building
What are the different methods for drawing an arc?
I am a civil engineering student and going to attend interview in this week in an IT company.Will they ask me questions about my area of interest or cs
why do we not deduct volume of steel to find actual volume of concrete in practical???
how to determine the correctness of proportion used in cement mortor and various IS codes to determine the same?
We are into industrial flooring (epoxy flooring) business. We buy material from manufacturers.We supply and laying the to companies. In our billing what tax/ taxes to be claimed from companies? Are we applicable for only WCT or any else?
sir i want to know that in L & T construction can we do our 6 months training proggramme cum placement???????