Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

if i want buy a pressure gauge then witch parameter i look

Answer Posted / rajkumar

Few things have to be taken on Account

1, The process fluid, Say if its Sulphuric Acid mean you have
to consider the metalargy for pressure gauges,
2, Type of PG, say when you gonna Install on a Pump Discharge
head mean there will be more Vibration, so you have to go
for Diaphragm type of PGs, else Fill Fluid,
3, Normally we choose the Range of PG by multiplying the
operating pressure with 1.5, Say operating pressure 5
Kg/Cm2 means the PG range must be 0 to 7.5 Kg/cm2.
4, Depends upon the Pressure range, PGs also Differ.

Is This Answer Correct ?    11 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

tell me the field & lab calibration procedure step by step with diagram of pressure gauge, pressure switch, pressure transmitter, temperature switch, level switch, flow switch, flow transmitter, temperature transmitter, temperature indicator, flow indicator, level indicator, control valve, thermocouple, pressure indicator (digital & analogue),

2315


In control valve proximity inductive sensor is taken as digital feedback for full open and full close.Normally its volts 24v when the sensor acts the feed back voltage 14v so that our relay not indicating in plc panel . kindly give the solution.

1983


why I need valve guard and whats different between guard and positioner ??

1401


State some of balance principle’ advantages?

1187


Is it ok, to use non-contact type Radar type LT, on a tank that is half circular from the bottom side? If yes the, isn't the waves gonna bent in other directions? 

2188


Decibel.

2554


How to Calibrate Ultrasonic Level Transmitter in field

1364


what are the definitions of input, output, command & signal according to instruments controlled by PLC using DCS System?

2127


how we are selecting instuments by differentiating certain instruments in 4 to 20 ma range and certain in 1 to 5 v dc

2085


what is orfics working in main steam line. is it increase pressure, velocity of steam flow and dicrease steam flow rate. or any other

2196


what is interface level and how it is calibrate?

2410


How will you calibrate PID controller? explain with example.

2439


1.what is controller proportional gain 2.what is the controller intergral action time. 3.A proportional plus derivative controller that has a proportional band of 20% and a derivative action time of 0.1 minutes. Construct the shape of the output waveform for the triangular input if the input rises and falls at the rate of 4 units per minute.

2688


what is o2 analyzer and how it measured ,what is the role of this analyzer in cfbc boiler...

2013


A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.

2178