what is water cement ratio and how to calculate it after
designing the concrete?
Answer Posted / ram
first checking of weather condition of the concrete mixing
plant,& moister contant checking of Fine & Coarse
agrregate then after calculate water cement ratio and then
it will decide before design a mix.it is clearly define @
IS 456
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
very simple or less time consuming formula for reinforcement calculation by moment
Define What is the best type of wood glue?
how to calculate cost of raw materials of a building for 1000 sqft & also consolidated cost of labour in a 1000 sqft building
What are advancements in civil engineering?
In cement concrete how to check a quality of material also proportion of material at site ?
Used Cement & Sand in 1 Square Meter or 1 Square Feet For Brick Work 0.115mm ? (1:4) (1:6)
hoe much fine & sourse agregate required for concrete mix of 1: 1.5:3 by volume in Cu.Ft
What are the different softwares used for cad?
How can we calculate 8- storied Madrasha Building pile capacity by taking SPT value at site?
why development length = 50D . why not 100D
I am a civil engineer . I am also selected for sbi clerk interview which is to be held on 4th May2010 is there anybody resembling the same? what question can be asked and what should be the probable answers?
how many litres of enamel paint required for 5000 sft of site??
Define What is diversion tunnel in a dam?
how to take the quantity of block work and plastering 1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate
For Granite Flooring,For Cement Slurry purpose which one is effective of cost control whether OPC or PPC or White cement?