Answer Posted / j.saminathan
soil classification should be necessary because through
that only we can caculate the SBC of soil to desing the
structure
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
What are the ingredients of pre-stressed concrete?
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
why we can use dust in concrete insted of fly ash
why is M30 grade Concrete use for Foothing & Column M50
what will happen if one could not properly follow the spacing of slab reinforcement bar?
how many numbers of 4inch bricks and get consumed in 9 inch BB masonary wall in cubic feet.plz send my below e.mail adress
What will you do if a portion of load bearing wall collapses under your supervision?
Define What are the uses of alloys in daily life and how are alloys made?
How do you prepare Material Recovery Statement for deduction from contractors bills?
How to build the floor to ceiling bookcase?
(Project Management Topic) What are the important criteria in the successful realization of the project?
can i get civil engineering test papers.......?????
1) write Short notes about Shellow & Deep well? 2) What is the full form of SPT & SMB? write short notes. 3) write short notes about efficiency of Riveted joint.
Which brick is best for construction ,either fly ash or AAC BLOCKS