WHAT IS THE %WASTAGES OF CEMENT, BRICK,TILES, STEEL,IN 1
M3,10M2,1 TON RESPECTIVELY

Answer Posted / m.n.alam

Dear sir i want to know in which i.s.code this is mentioned. please tell me my e-mail is alambly@gmail.com

Is This Answer Correct ?    1 Yes 7 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to take concrete quantity for precast segment for viaduct project?

2584


Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.

2370


hi, i am doing my B.tech third year and i want to have a job in Genpact...So can you help me which kind of job would be more appropriate for me in such a company and How should i prepare for an interview?

1968


it is a corrected question." make a list of engineering property(properties) of soil.

1600


can you please tell me what the current rate of construction material and different construction labourers charge in bangalore ???

1450






I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.

1552


What is the meaning of a blue land surveyors flag?

786


Why should pumping be not used in case of concreting works?

999


what do you mean by yeild stress of a material? What will happen when hit is given to cement?

1911


what is SDLC ?and write a 'c'program for to swapping the three numbers?

1401


For fine aggregate which is most suitable River sand or crusher sand & why ?

1333


why & what is perchatage we are using fly ash in concrete?

2204


Why steel rods are produced only in even dimensions?

2163


Anyone have sample questions for bhel interview.please send me as Iam appearing for the interview on 19th sep2008. Kindly send this to my e-mail: arun_prasath_n@yahoo.co.in

1604


manhole height is 1500 mm and width of brickwork is 230 mm dia of manhole covering is 560 mm brick masonry 1:4 horizontal length is 1500 mm and plaster 12 mm thick on both side 1:3. how to estimate the quantity of brickwork with mortar cement and sand for manhole chamber.

1655