When do you prepare Requirement Traceability Matrix(RTM)
before testing aor after completion of testing?
Answer Posted / jasdeep
The Requirements Traceability Matrix (RTM) captures the complete user and system requirements for the system, or a portion of the system. The RTM captures all requirements and their traceability in a single document
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
How do you estimate white box testing?
What types of testing is specifically important for web testing?
What are the principles of software testing?
In how many ways you perform batchtesting ?
What is CVS and why it is used?
What is Stability and Performance Testing in Testing the TV
Explain the advantages of automation over manual testing?
write test case for linked in sign up page ?
What is your daily process? I have 2+EXP IN MANUAL TESTING.PLEASE SUGGEST ME HOW i ANSWER
How many bugs occured will be considerd appropriate over 1000 steps when inspecting software? Describle an approriate Bug value.
Can you please provide me the standard testcase review templete and Test plan templete.In my company we are not following any Standards templete so.Please guve me some Excell attachments.
Hi Everybody could you please send me the ISTQB Material to my mail id karthik18487@gmail.com Thanking you in advance
when do you escalte issue to your manager?
I have an UI issue "please fill out this field" pop up in firefox browser keeps scrolling with the page is it valid???
Is compatabilitytestig and port testing are same