db2 maintains information about the data... a.in tables.
b.in a set of tables known as db2 catalog. c.in db2
database. d.none of the above. 1
What is the maximum number of tables that can be stored on a
Partitioned Table Space ? 1
what is contained in the DB2 node lock file? A) data base
names B) data base users names C) license keys D) server
names Accenture 5
Can a primary key have null values? If we try to insert a
null value in a primary key column, will it work or give an
error code? 6
When you are working with the project after coding what will
u do? Like what type of documents u will prepare? How will u
do testing? 2
how to delete perticular row from table for ex. how you will
delete 3rd row from table please answer THANKS IN ADVANCE IBM 7
max number of columns in a db2 table? 6
What is package versioning? Please give an example. 1
What is the picture clause of the null indicator variable? 6
How do you filter out the rows retrieved from a Db2 table ? 1
What is DB2 (IBM Database 2)? 3
Can any one tell me about Restart logic in DB2.
Answer Posted / guest
que) can primary key have null values?
ans) no, primary key muse have the value (not null)
que)how to delete particular row from table.(3rd row)
delete from emp
where rowid=3
que)What is the picture clause of the null indicator variable?
ans) 01 sal-ind pic s9(4) usage comp
exec sql
select empno,sal
into :empno,:sal:sal-ind
from emp
where empno='e007'
end-exec.
Restart Logic...
- There is only one commit or rollback before termination of
transaction.
- suppose a application program is processing 1 million
records and the program abends at 90th thousand record. so
after restart of the program it is going to process all 90
thousand successfully but not committed records once again.
then this will became a problem..
- so when ever we are doing such huge updation we need to
use commit frequency properly. Let us say we have design
application commit frequency at 1000 record. If the program
abands at 1500 record it should get restart at 1001 record.
this is called as restart logic.
- for that create a temporary table with dummy record and
insert a record in the table for every commit with a key and
occurrence of the commit. this should happen just before the
issue of the commit.
- then the first paragraph from the procedure should read
last record from the table and skipped all the records that
are successfully processed and committed (1000th record).
After the processing of all the records, delete the entries
in the table and issue one final commit.
correct me if i am wrong
thanks
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is the function of dd disp parameter?
what is the resolution for sb37 error
How can the submitting users racf authority be overridden in a job stream?
Which statement is used to identify the private libraries in job?
How to read and write a single record into a file. I would like to use it to enter a single 8-character piece of information and use it to put it into a variable for processing in JCL. Thank you
what are JCLLIB and STEPLIB in JCL?
What is the function of //jcllib statement?
Which dd parameters are required?
Is condition checking possible in jcl? If yes, how?
what is “Cond= even” and “Cond=only”?
What are the parameter we cannot use in procedure? How many instream we can write in single jcl?
The disp in the JCL is MOD and the program opens the file in OUTPUT mode. What happens ? The disp in the JCL is SHR and the pgm opens the file in EXTEND mode. What happens ?
Explain how can return codes be tested before execution of a job step?
Is it possible to code instream data in a PROC?
How to pass the parameter in parm using linkage section ? (syntax)?