how can we calculate the amount of concrete in trapezoidal
footing?
Answer Posted / satya.mvvs
It can be find by averaging method
By averaging the width / length of the the footing
| Is This Answer Correct ? | 1 Yes | 2 No |
Post New Answer View All Answers
what might be the problem faced in the near future if the M-sand is used in the place of river sand during wall plastering? (As per IS)
List out the potential risk factors for workers on the construction site?
How to avoid fly ash seed ball formations in the concrete mixer while mixing of raw materials for fly ash block manufacturing?
What are the responsibilities of a construction manager?
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
what is the mix design for M:60 with micro silica andmetakaoline?
I need to constructive work in amaraj batteries
calculate the quantity of cement ,sand,bars and aggregate used for 28*4 ft with 4 inch (125mm) thick
HOW MUCH STEEL REQUIRED FOR SLAB OF AREA 23'3"*18.3"? FOR SLAB HOW MUCH DIAMETER BAR WILL USE?
sir iam dng my engg final yr (civil) iam intrested to write group_1 .if we write this exam what kind of jobs we get and what should be the minimum score for us to get qualified and iam having reservation too.
how meny typs of renging rod?
What are the applications of cad?
Are you ready to relocate with your immediate family to United States as a new employee?
What do you mean by tolerance factor of concrete ?
cud any one send me tech quest paper(civil engg) at tarizus@yahoo.com