how can we calculate the amount of concrete in trapezoidal
footing?
Answer Posted / satya.mvvs
It can be find by averaging method
By averaging the width / length of the the footing
Is This Answer Correct ? | 1 Yes | 2 No |
Post New Answer View All Answers
How foundation is designed, Column design and beam design
Floor tile measurement? Wall to wall or skirting to skirting
How to calculate Acctually Brickwork Quantity in Honey Comb Brick in circular Soak Pit
In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.
Technical Question of Civil Engineering
Used Cement & Sand in 1 Square Meter or 1 Square Feet For Brick Work 0.115mm ? (1:4) (1:6)
Can inverted beams used in pipes during construction? If yes, explain how it can be implemented?
Does degree of bend of rebars has any effect on strength of the member? For example- if a beam is designed with 45 degree bent up bar with respect to architechtural needs and is not 45 in practical so will there be any reduction in the strength of member?
where tie beam is used? what is the pupose? what dimension of tie beam can provided and number and diameter of steel bars to be used between the columns of 1333mm and 1400.
what is your role of in previous company as a construction manager
when reinforcement binding completed if there is more cover than the required what is the solution to reduce the cover?
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
What is the difference between linear dimension and aligned dimension?
how to calculate the scour depth
how many sqft or cft of work done by a mason per day in all works such as brick,block,concrete,shuttering carpenter,reinforcement fabricator,painter,door window carpenter.....everything thank you