how can we calculate the amount of concrete in trapezoidal
footing?
Answer Posted / prashant verma
if A is length and B is breath and H is total height of trapezoidal footing and a' and b' is size of column n h is trapezoidal portion height.
then total qty of concrete is=A*B*(H-h)+[{h/3{a^2+b^2+(ab)^1/2}]
where a=A*B
b=a'*b'
| Is This Answer Correct ? | 6 Yes | 2 No |
Post New Answer View All Answers
How to calculate thickness of MAT slab & Reinforcement? The dimention of under ground water reservoir is 80'X14'X 12 ft
why we use aggregate,sand with cement in concrete?
why should we use 20mm graded metal only in vrcc?why we shouldnot use 40mm metal?
when reinforcement binding completed if there is more cover than the required what is the solution to reduce the cover?
How much cement and sand are required for 1 square feet of plaster at a thickness of 15 mm at a ratio of 1:4?
What are the different types of foundation?
What Are The Different Type Of Slump Test Indications?
What is the diff between cad & cadd?
what is the maximum number of course that can be laid according to IS code and the max height.
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
what is the formula to find the diagonal shape stirrups?
What is the substitute of Mastic Asphalt?
What is the strength of cement?
What year was the keystone power plant in Indiana County constructed?
Find out Cutting Length of Steel for Right angle Triangle? Where Opposite Side 4m, Adjacent side 6m. (Assume cover 40mm)