9*9 1:4:8 ratio using how to calculate the material for
40mm aggregate ,cement &sand please tell me answer
Answer Posted / ronak shah
first of all i m not understand 9*9.
so i consider 1m3
52% more shrinkage and wastage.
1.52m3
cement= 1.52/(1+4+8)=0.1169/(cement bag volume in m3)=
0.1169/0.0348= 3.35 bags so 168 kg/m3.
sand=1.52/(1+4+8)=0.1169*4=0.47m3
aggregate=1.52/(1+4+8)=0.1169*8=0.94m3
| Is This Answer Correct ? | 47 Yes | 5 No |
Post New Answer View All Answers
What is the outturn of Ceiling plastering
can i get civil engineering test papers.......?????
residential projects,structural.
One plate (women civil worker lifting Plate - Satti) sand measures how many cubic feet?
Explain the various stages of the project planning process in construction?
the volume of cement req for 70cum of brickwork in 1:6 cement mortar is approx is equal to 3cum 5cum 7cum 1ocum
what is tension footing?
What distance in meters on the ground is the equivalent of one second of arc in longitude or latitude?
What is the density of most of construction materials?
I Want To Know Quantity of Cement Conc. & Sand in Column of 9"x9"x10'
How to design staircase.plz tell me formula for the design the staircase.
is there any thumb rule for calculating construction cost of the building with pile foundation per sft. area?
How can we calculate 8- storied Madrasha Building pile capacity by taking SPT value at site?
design the irrigation canal(b,B,h )head is 3tms of water is supplied to the 200hectars of area and the base period crop is 150days dance to water travels as 35km.the canal section is trapezoidal and also calculate the slop the canal
What is the amount of work done by a carpenter, bar Bender and plaster Mason in interior and exterior plaster