9*9 1:4:8 ratio using how to calculate the material for
40mm aggregate ,cement &sand please tell me answer
Answer Posted / sravan875
Cement =182.3 Kgs
Fine aggregate =182.3*4=729.2Kgs
COarse aggregate=182.3*8=1458.4Kgs
| Is This Answer Correct ? | 11 Yes | 3 No |
Post New Answer View All Answers
rate analysis hiring of generator 62.5 KVA
PLS.......... ANY ONE CAN FORWARD ME PREVIOUS QUESTION PAPER hpcl civil engg
What is the different type of slump test indications?
i) Distinguish between Theodolite and dumpy Level? (Marks-8) ii)Distinguish between Viscous and Turbulent flow? (Marks-8) iii) Distinguish between nominal and design mix? iv) What is standard sand? v) Explain the term plane stress? Vi) Differentiate between principal plane and principal axis? Vii) write short notes on Elastic limit of structural steel? viii) Write short notes on stress concentration? ix) write short notes on "Grading of Sand" ? x) How many grades of concrete are there under standard concrete?
density of crush sand & crush stone or grit powder
How to identify the vitrified tile and ceramic tile by observation only after executing the job.
is there any thumb rule for calculating construction cost of the building with pile foundation per sft. area?
02. a. The diagonal of a 9 cube…………… 1 b. Surface area of 9 cube…………… 1 c. Volume of 1-3 cube …………… 1 d. Compressive area of 6 cube …………… 1 e. Top & Bottom face of a Cylinder/Cube is to be proper leveled to deliver the…………………………..…… properly.
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
in plate load test what is the thickness of plate 20mm 5mm 50mm none
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.
how we calculate the vol.of wet concrete..?
a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.
quantity of sand and cement for 10m2 plastering 10mm thick for the ratio of 1:4,1:3and its leabour data
Permissible wastage of cement as per IS code ? In which IS code I get it?