THERE IS MAINLY TWO DIFFERENT BEETWIN dcs & scada SYSTEM
1) DCS system it self whole control system & SCADA system required plc for controlling.
2)dcs SYSTEM scan time is nearly 1sec & SCADA with PLC system scan time is in millisecond(depends on program).
3)DCS having Large I/O capacity with respect to SCADA with PLC system.
| Is This Answer Correct ? | 5 Yes | 2 No |
Post New Answer View All Answers
what different types of problems do occur while doing instrumentation commisioning and how to solve them? please explain in detail
Explain the working of an enraf level gauge.
Please tell me details about Sox,Nox,SWAS analyser????
Why mmwc unit is used?
Why does a pressure gauge installed on reactor, doesn't have any vent line below to release the pressure? Is it any kind of designing mistake or it actually does not require any vent line? And if it does not require any vent line below it then how we are gonna release the pressure built inside the pressure gauge?
What is the right procedure for adjusting the gap voltage of bently nevada vibration sensor?
applications of plc in printing and packaging?
how will you segregate the alarm levels in alarm management system during factory Acceptance Test
Linear amplifier.
when a magnet is heated?
what is compensation? temprature & pressure
I have 0.75mm sq multicore cable (IS type) , can use instead of same type but 1.5 sq mm cable ? Note : The distance is around about 150 meter.
Calibration procedure for electro magnetic flow meter
How to calibrate the flow transmitter
how we are selecting instuments by differentiating certain instruments in 4 to 20 ma range and certain in 1 to 5 v dc