How to calculate the quantity of water in cement mortar eg.
CM 1:3?
Answer Posted / ajay saini
Actually it depends upon the weather condition.The amount of water can change according to the weather.1 liter water is sufficient for 10 kg of cement.With the Aggregate the amount of water will be increased.
| Is This Answer Correct ? | 2 Yes | 9 No |
Post New Answer View All Answers
if i used salt as a add mixture in concrete, then what will happen and what are the naturally available add mixtures.
what is the use if we fixed butterfly ties in column and masonry work joint?....where we have to fix(distance)..
What will be weight of 0.5mm GI sheet per sq.ft?
How does a traffic light signal work ?
If a slab concrete is placed with M-20 grade concrete, actually it has to be placed with M-30. what are the rectifications / measures to be taken after concreting is done.
Can inverted beams used in pipes during construction?
why top layer of block work shoud be full size if any cut block adjustable than another layer?
I want to know the material required per Square foot in rcc roof i.e.Steel ,Cement,
I need old MMUP exam question and answer for Civil engineering
what is idealized curve for concrere and steel
What is the use of water table & Kreb stone for drain
how many litres of enamel paint required for 5000 sft of site??
Define What is Civil Engineering?
what is the cost differene of a same structure when it is constructed with brick masonary, and when it is constructed with concrete as a frame structure.????????
What are the skills required to become an architect?