what is the diffrence between R Y B phase and why it is
called RYB
Answer Posted / raj
the fact is that phasors rotate in anti clockwise direction but they are named in clockwise direction...try thinkin over it for a moment, it will make sense..
| Is This Answer Correct ? | 3 Yes | 2 No |
Post New Answer View All Answers
Explain the laying procedure and laying depth of submarine/subsea power cable for 220/400KV system? Also available cable diameter?
What is difference between Sample test and Routine test in safety standard?
what will happen if the prime mover on the field excitation of the on-coming generator fails?Explain.
What about electrical Units. discrive in detail
Why should we hire you over the others waiting to be interview?
being an electrical engineer why you wanna come into software i have an very good academics what answer i have to give
What does the kvar means?
explain single phase series motor
i am gng to visa interview this july i have 4 backlogs gre 1010,toefl 75,pls give me the tips pls pls
what are the effects when a salient pole alternator is run at high speed like 3000 r.p.m?
how much winding resistance of 0.75kw to 12.5kw 3ph sqwiralcage induction motor?
Dear all, i completed M.E(Power Electronics & Drives) 2011 passed out having 78% so i need job in core side but i don't know how can i receive the calls from electrical companies and i uploaded my CV in naukri, times jobs etc.. In that iam not recieved any mails from good companies so give me best procedure plzzzzzzzzzzzzzzzzzzzzzzzz..... Thanks, K.Linga Reddy Email-id:-lingareddykmthm@gmail.com Ph no:-08015402078
What is phase cross over frequency?
how to calculate the tarriff for an industry whose kva demand is 10 mva
A 7 storey building has a floor area of 35,000sq.ft on each storey. On the ground floor 11KV electrical sub-station is to be erected. A load of 3kw for every 400sq.ft (p.f is 0.8) is proposed for each floor. fire pump 7.5hp, water pump 5hp, lift 2 nos, each 10hp and 20shop load of each shop is 5kw. calculate a. load each floor b. total load of building c. L.T feeders for aech floor and from transformer to main. d. distribution diagram e. capacity of sub-station/capacitor bank f. line diagram