Answer Posted / muhammad nisar
1.No of I/O,S
2.Nature of process application i-e critical or non-critial
3.HMI form one or more Control Rooms
4.HOT SWAP(removing I/O Cards during plant Running)need or
not.
5.Plant Future extension required or not.
6.Logical synchronous or Non synchronous system require
7.Progamming Fexibility level requirements
8.Single Control process required or Distributed
9.Permanent installation or for short time
10.Expensive solution or non-expensive
and many more factors can easily diffrentiate it.
MUHAMMAD NISAR (I/C PROJECT MANAGER)
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
sir i m preparing for BARC but i am not getting any papers to prepare for this exam so please send me some sample papers to my i.d for the preparation of barc.
I need to know steps to Calibration Valve Guard......
whats the abbreviation of IOP? is it instrument of power or input open problem?
send me last 5 years questions asked in rrb chennai, for section engineer
centrifugal compressor interlock? Tell me the parameter at which compressor will trip
How INtools is useful for routine Instrument maintenance?
How to calibrate displacer type level transmitter (chemtrol make )for level measurement in hotwell , LP & HP heater ?
please tel me the calibration of pneumatic controler.
How oil line flow measured?eplain about instruments used and working principle?
what is vibration a part of proceess variable? if vibration is a part variables then how we minimize the actual vibration on machine on load,? vision of instrumentation contrl plz ans me IPGDL interview question
Regarding , there is an air cooler which control the fans(50% of AV FANS) by temperature in outlet , and the louver of Air cooler is controlled by HIC from control system , So if on Air cooler we will consider 2 individual I/P converter or positioner?
what is scale factor of proximitor & unit of the vibration.
When doing a liquid seal on a differential flow transmitter , most of the time the sealing liquid will be heavier then the process fluid. For wich application will the sealing liquid be lighter than the process fluid if transmitter is mounted below the process line.
POSSITIVE PULSE IS APPLIED TO AN INVERTER INPUT.THE TIME FROM THE LEADING EDGE OF THE INPUT TO THE LEADING EDGE OF THE OUTPUT IS 10 ns. THE TIME FROM THE TRAILING EDGE OF THE INPUT TO THE TRYLING EDGE OF THE OUTPUT IS 8 ns. WHAT ARE THE VALUES OF tPLH and tPHL?
how many type conductivity sensor ?