What is the formula for finding fault level of generator?
Answer Posted / jignesh
we have 3 sets of generator running in parallel gen data 11kv 2000kva 1600kw transient reactance 0.1772and sub transient 0.1998 NGR 63.2 ohm . What is the fault level and fault current ? Please give me the solution on my mail id
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
If we have to feed a housing complex having load 8MVA, than what would be the better option, either we first step down 33kv supply into 11kv & than 430v or we proposed no of 33/.44 kv transformer, also which option is economical?
What is the reason of polyphase induction motor tripping suddenly on high current during running at 70% laod? Motor IR , winding resistance & inductance balance. Motor no load current is balance and ok as per mgfr. data.
What are the advantages and disadvantages of open loop control system?
List the characteristics of filter?
with help of neat sketch explain principle of TIG welding process
1. How many types of mangers? 2.How many types of capacitors? 3.pls tell me normally types alternator problems?
what is rating boiler
how can i get an electrical c-certificate?
when we design electrical schemes of 11/.415kv distribution..wen and were should we show the relays??what is the function of it?for example..we place EFR Relay CT between transformer neutral link and transformer earth.Like this what are the other type of relays we should use?why?where?Explain please..Thank you
The SFC of an engine is 0.25 kg/kW hr. when the fuel used has a calorific value of 36000 kJ/kg. the thermal efficiency of the engine is
how to test reverse power trip?
Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.
sir plz send some previous year questions of jspl.
what is the principle of the single phase energy meter? and,what is the advantages and disadvantages of single phase energy meter?
what is laser diodes?