Answer Posted / anand kumar singh
SIMPLY YOU CAN SAY -RESTORING MOMENT IS CALLED BENDING MOMENT OR
AT THE CROSS SECTION OF BEAM ALGEBRIC SUM OF MOMENT OF FORCES ON RIGHT OR LEFT SIDE OF THE SECTION IT MAYE BE sanging or hogging
SHEAR FORCE:sum of the all unbalanced vertical forces to the right or left of section acting at the cross section of beam is called sher force.
| Is This Answer Correct ? | 5 Yes | 1 No |
Post New Answer View All Answers
What is the method of soil replacement test?
Define What is the meaning of a blue land surveyors flag?
How to activate isometric axes in cad?
why we are using stub column..? is it possible to construct steel stub column..?
Please Clear My doubt . We Can Design the size of the beam by manually by the Length of the beam...What is the technique adopted
on what basis the partial factor of safety are decided? form the load combinations
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
How much river sand contain the 6 & 10 wheeler truck? Or Maximum sand that any type of truck carry?
brickwork labour rate per cum ?
Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.
what radial pressure, the NP2 class rcc pipe can sustain?
What is the difference between the concrete mix design carried out by IS10262 and by ACI method ?
how much shouid be the rate for ready mix concrete per cubic meter
1) write Short notes about Shellow & Deep well? 2) What is the full form of SPT & SMB? write short notes. 3) write short notes about efficiency of Riveted joint.
Define What glue is least sticky?