Bitumen grades are 30-40,60-70, 80-100. what is mean by 30-
40
Answer Posted / anwar_eng04
the rage 30-40 means the bitumen has having grades between
these two valus and and it is determined by average
peneteration value of the test which conducted by the
instrument called penetrometer.
| Is This Answer Correct ? | 37 Yes | 5 No |
Post New Answer View All Answers
Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m
Calculation of Pier Cap with tapper area?
what are the duties of Site Engineer in work site?
How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 100 microns?
What is the origin of name railway sleepers?
material used for mendrel use to bend epoxy coated rebar
very simple or less time consuming formula for reinforcement calculation by moment
Define What is the force exerted by the Tacoma narrows bridge?
what is the calculation of raw material for 0.35cum of m-15
What is the difference between yeild strength and compressive strength of steel???
What is the per cu. mt. price of ready mix in Gujarat region.?
what is moment-curvature relationship in semi rigid connections??
How to test cement,sand,20mmbluemetal,40mmbluemetal,bricks,concrete by visual and instrument
how to calculate the density for high density concrete ? or is it same as the density of RC?
can you give me the details of rate analysis of steel and concrete?