9*8m slab 1:2:4 ratio use for M20 mix how much cent is
require it will become in cum but i want bags.
Answer Posted / harathi nitin
9m x 8m x 0.1m = 7.2cum
1.52/(1+2+4) = 0.217cum
sand = 0.217 x 2 = 0.434cum
agg = 0.217 x 4 = 0.868 cum
cement = 0.217 x 30 = 6.51bags
for 1cum = 6.51 bags
for 7.2cum = 6.51 x 7.2 = 47 bags
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
Which is the direction of negative angle?
What is the cost of shuttering per Sqm.? How it is calculate by thumb rule...?
What is the difference in painting using Roller and Brush? What is the paint consumption difference? As per IS one coat of painting is painting from left to right and top to bottom whether this can be done using roller ( Roller Stick height and feasibility) ?
How much cement and sand required for 9"brick wall per square metre
give me the rate analysis for Bituminous Macadam and SDBC
how i get all type of short type question answer about civil engg
Test procedure of fly ash bricks as per code ?
What do we mean by partial moment release ??
What is meaning of tlc
IS THERE ANY JOBS FOR THOSE WHO ARE IN FINAL YAER OF ENGINEERING(CIVIL) IN MUMBAI
door and window wood work calculations and different methods
Doul Bar reinforcement and details of drawing.
how much st. steel is required for staging of concourse slab of a elevated metro station allowing through traffic .
Actually i am confused that how to calculate the bending moment for a semi-circular beam and curved slab.If any one have a good idea about the matter,please give the answer with a suitable example. Thank you......