What is a BBS?Find out the cutting length for a 300*300 column with 40 mm cover?
Answer Posted / muthu selvam
BBS= BAR BENDING SCHEDULE. it use to calculate how much kgs
steel want to building. cutting length of column=880+140=1020mm
| Is This Answer Correct ? | 4 Yes | 8 No |
Post New Answer View All Answers
how to calibrate the RM 800
how to calculate the material from ratio of work PCC, RRM,POINTING, RCC
WHAT GOAL DO YOU HAVE IN YOUR CARRIER?
How to measure the requirement of cement n sand for 12mm and 20mm plastering thanks in advance
why we create short columns under grade slab?
significance of specific surface area of particles?
What is meaning of tlc
To pcc 11 ft x 24 ft .How many bags of cement, sand and aggregate required? And for roofing how many cgi sheets required?
Is it worthwhile to carry out tests on particle density of soil particles for geotechnical design?
in 100 cft = 1350 bricks in 100 cft = ? bloks
What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.
I need to do a Compressive Strength Test for a specimen made of Rubber. Before doing the Test on the Machine, I need to have an idea of the Minimum and Maximum Compressive Strength or Yield Strength of the specimen. How can I calculate that?
What are the techniques to measure road difference?
what is the water-cement ratio of mix design while 30mpa in 7 days?
What is the primary difference between adsorption and absorption?