What is a BBS?Find out the cutting length for a 300*300 column with 40 mm cover?
Answer Posted / muthu selvam
BBS= BAR BENDING SCHEDULE. it use to calculate how much kgs
steel want to building. cutting length of column=880+140=1020mm
| Is This Answer Correct ? | 4 Yes | 8 No |
Post New Answer View All Answers
Why the statue of liberty is made of copper?
If 40 backlogs are cleared m finally with 65 percent marks . Am I eligible to get visa to US
In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.
what is SDLC ?and write a 'c'program for to swapping the three numbers?
For the calculation of bearing pressure below the footing, to know whether it is below the safe bearing pressure of the soil, the unit of RCC below ground level to be taken is 25 KN/m3 or (25-15)KN/m3, where 25 is the unit weight of RCC and 15 is the unit weight of soil and whether the weight of backfilling to be taken?
How to calculate Volume of Wet cement concrete for a specific grade?
what is flexible and rigid footing?
how to calculate the size of triangular ring in rcc column?
how to frame the sentence in voucher pad ? Description : 1.Food Expenses during site visit 2.Stamp Paper approval expenses 3.Travelling expenses 4. sweet distribution
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
What was asked in isro civil interview
What is M40 _ TOR - EQ and B.F.S
What is meaning of tlc
How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?
what are the types of design? which type of method is used at what type of design & why?