WHY WE CAN GENERATE POWER IN 3PHASE MODE ONLY NOT IN 4 OR 5
PHASE?
Answer Posted / pavanchoudhary
we generate in 3 phase instead 4&5 phases as co-terminal angle of resultant vector cancles instead we go head for 6 phases since by by tilting one of 3 phase transission line by 60 degrees we can pose into first 3phase line so same circumference now propagating double power but it loses linearity when move to 12 phase accampained with sophisticated network as 3phase line require 3 circuitbreakers and 3 busbar at substation 6phases requires 6 C.B & busbar
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
There is any especial requirement for motor to drive through with VFD?
What is the typical enclosure type used for Indoor switchgear / Outdoor switchgear Units? - In Onshore / offshore Units?
how to choose cable size with respect to load? how to convert cable size in mm2 to sq.mm?
why the rotor current becomes in steady state during high slip region? please verify with equations.
Why we used 690V in ACS 800 drives.Why dont use standard voltage like 415v or 1.1Kv
What current position are you holding in your current company?
what is plunger and what's the use of it in motor alignment?
what purpose to use excaiter in DG.?
AL=0B9H,bl=75H, ADD AL,BL AL=____________? CF________? OF___________?
how to calculate the earth fault current
The size and construction of bushings in a transformer depend upon?
According to underground cables a) stress b/w sheath & conductor is high b) inrush of core & conductor
how to get bearing & winding temperature of an induction motor?
what is the reactive power what is the use of it in system
3 shows a 415 V, 3-phase generator supplying a 3-phase 415/110 V transformer. Draw the individual and combined impedance diagrams to a base of 10 kVA. Determine the system fault kVA and the fault currents at the 415 V and 110 V busbars for short circuit faults on the transformer input or output terminals. Work in p.u. values of impedances.