Answer Posted / zac
40,ooo to 100,ooo vare required to fire a spark plug
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How does a hammer mill work?
What is the gas constant r for air?
is there a future for a mechanical er. in supplier development field ?
what is difference between british wire guage & birmingham wire guage
Which pollutant is major greenhouse gas and what is its effect ?
Distinguish between creep and fatigue.
What type of pump is main L.O. pump?
Define extrued aluminum?
How can you identify mild steel, cast iron, and high carbon steel?
previous question papers for group 2
what is the significance of line of action in gear?
In Turbine how the balence piston works and what is the direction of leak of steam flow.
Which technology is better for designing an STP system in a Commercial Mall. 1) SAFF (Submerged Aerobic Fixed Film) or 2) FAB (Fludized Aerobic Biological ) or 3) Some other.
current rating of a 3 phase dg set is 20 amp, but what will be the per phase current for single phase supply?
Dear all, Will some one help me in this issue please? We are entering the Zero Stock Component in Maintenance Order, and we make a Check when the order creator is going to release system will appear Error, until he will not delete that zero stock components from the Maintenance order. but right now what the order creator is not releasing the order but he is going to save order, when's he save the order without release system will generate Reservation in the back ground, which should not happen for Zero Stock Components ? I need the way which we are doing in MB21, Reservation creation by thru Cost Center / WBS Element. At present if you run MB21 and you are going to issue the material system will not allow to generate the reservation if there are zero stock components in the list. please guide me for this issue ? Note : Simple what I need is I don't want to create any reservation thru maintenance order for the Zero Stock Components. Regards, Abdul Mujeeb