Can I use 1 phase power supply to run 3 phase motor? If yes, how?
Answer Posted / muthuvel
No, 1 phase power supply can excite one winding only.But 3
Phase motor having 3 windings for that it Requires 3 Phase
supply...
| Is This Answer Correct ? | 8 Yes | 2 No |
Post New Answer View All Answers
substation+ plc system
our factory is going under construction mean time transformer 1000 kva 2 nos &load break swithch 12 kv & 4 nos 750 kva 2 nos & 380 kva 2 nos generator to be errcted.how to arrange earth pits &how to earth connect & neutral pit how to calculate in earth bit size.
Actually I have a doubt on neutral and earth.we use Ac power without taking neutral by connecting to earth,but at that time does it affects on efficiency of any electrical components or no? If yes how?
please send privious years question papers of jindal steel and power ltd.My e mail id is rajanikant.sngh@gmail.com
How much depth n width required for laying of 1X70 Sqmm Cable in Desert???
what is the Pickup/drop off ratio in BCPU relays
Why 15Amp. MCB is suitable to carry load of 1.5Ton Ac please Explain?
Is a 300w induction motor used in a food processor as powerful as a 1000w DC motor.
What is touch potential and step potential?
WHAT SHOULD BE THE BEST CURRENT RATINGS (PRIMARY / SECONDARY)FOR A CT INSTALLED AT THE INCOMING 11KV PANE? WILL IT BE CALCULATED ON THE BASES OF MAXIMUM DEMANT VALUE OR ON SUM OF ALL TRANSFORMER'S KVA? NOMALLY MAX DEMAND REPRESENT THE MAXIMUM OPERATING LOAD OF THE PLANT AND TOTAL KVA OF (SAY 5 NUMBERS TRANSFORMERS) REPRESENT THE CONNECTED LOAD. WHICH i.e. MAX DEMAND KVA OR CONNECTED KVA ARE BETTER TO USE FOR CT CURRENT CALCULATION? PLEASE ANSWER.
what is the purpose of slope in the differential relay?why we are using two slope?but in busbar differential we are using only one slope.why?
sir, 3phase induction motor takes different pf and different KW in three phase while running,explain reason
Electromagnetic torque developed by the motor is compared to shaft torque. A less B same C depends on motor design D more
What are the site acceptance tests for power cables, DG Sets, LT panels & 30kVA UPS ?
Define reserve-generating capacity?