Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Why 5kv megger used to megger 6.6kv motor or 33kv
transformer why not 500v?

Answer Posted / sanjeet kumar singh

Megger is used to check whether the insulation is ready for
bearing the nominal voltage at which the equipment is to
run. Since, a 6.6KV motor is to face the voltage of 6.6KV;
hence it is to be tested with 5KV megger. On the other hand,
if you measure the megger of 33KV transformer with 500V
megger, it means that you are giving the pressure of 500V
only to a system which is claiming to be sustain 33000V of
pressure. Hence, the test becomes meaningless, because you
are giving only 500V to a system which has to bear atleast
33000V. In addition, we should also know that basic meeger
voltage are: 500V, 2500V, 5000V. Above that you have to go
Hi-POT test.

Is This Answer Correct ?    7 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how can we determine size of a cable by knowing the kw or current rating of a load?how can we calculate the resistance box of a slip ring motor?

1751


i have faced a problem in ro plant grunfos make bm30type pump it is 22kw pump. We start this pump using siemens 3rw 4423-ibc44, 30kw softstarter but this soft starter will frequently failier so we planed to change dol starter. So pls tell anybudy its possible or not.

1920


What is the difference IN MCCB's between thermal magnetic and electronic tripping system ?

2034


Hoe do calculate the Cable size for Amps rating ?

2148


Write a note on materials used as a fuse element.

2119


how can we say that stator magnetic field rotates with synchronous speed?can we derive?

1767


What is icu and ics in Acb and how many time icu or ics passes from breaker?

1541


hai now i am working as a electrical design engineer in construction field can i get a job in oil and gass field or power plant project as a electrical design engineer?

1915


hi if anybody got model questions for cpcl Grade'A' electrical engineer position.send it to my mail please krishkumar22@gmail.com

1997


what are the industrail measures to over ferranti effect? how would the ferranti effect the power system if those remedial mearsure arent taken? how often does this effect occurs in real power system?

2139


How to know the following data of synchronous generator 1. D-Axis Unsaturated Reactance 2. D-Axis Unsaturated Transient Reactance 3. D-Axis Unsaturated Sub - Transient Reactance

2000


why need to be maintain power factor for industrial customer?

5056


L.A. (Lightening Arrester) is located at a place from where transmission line enters the transmitting substation. So L.A. (Lightening Arrester) is the first equipments which has to encounter with lightening, high voltage surges and switching surges. It has to absorb energy of lightening, high voltage surges, and switching surges. L.A. (Lightening Arrester) is made up of layers of semiconductors. If these layers can not tolerate energy released by lightening, high voltage surges, and switching surges the L.A. (Lightening Arrester) blasts.

1098


What is Harmonics how it is produced and what is the method to control the same

2269


Work done in a free expansion process is

1156