Which is the best between SCADA & PLCC & Why ?
Answer Posted / m.subashree
PLCC is the programmable logic control which is used to
interlocking of different components.
SCADA means data acquisition system some times its not
perform a control operation...
| Is This Answer Correct ? | 3 Yes | 12 No |
Post New Answer View All Answers
how we do Vector group ,magnetic balance and tap changer test in Transformer?
In single phase capacitor motor, if the motor rotate reverse direction then how much power will be consumed by the motor and why?
How to work meggar?
What is the diff. between single compression and double compression gland
Explain and give examples about VCB?
What is electrical diversity factor in electrical installations?
How dia computation perfomed in cold rolling mills .
Why the field rheostat is adjusted such that the voltmeter reads 380V
i've iocl interview.. if you know the interview process please give me information..
Explain what are inter-poles and why they are required in a dc machine.
induction 3 phase motor terminal connection
L.A. (Lightening Arrester) is located at a place from where transmission line enters the transmitting substation. So L.A. (Lightening Arrester) is the first equipments which has to encounter with lightening, high voltage surges and switching surges. It has to absorb energy of lightening, high voltage surges, and switching surges. L.A. (Lightening Arrester) is made up of layers of semiconductors. If these layers can not tolerate energy released by lightening, high voltage surges, and switching surges the L.A. (Lightening Arrester) blasts.
why does make gain margin and phase margin on same plot.?
Do you need any help with FEWA Electrical Supervisor exams?
Define conversion efficiency of a power amplifier.