Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

extremely urgent please, why a fuse is used before
voltmeter but not with a ammeter connected to a CT(current
transformer),thanks in anticipation.

Answer Posted / syed shoeb ullah hussaini

look man ... In c.t load is
connected to the primary
winding and ammeter is
connected to secondary
winding hence there no fuse
in c.t .... Similary there no fuse
in potential transformer as
the voltmeter is connected on
secondary side with closed
loop of secondary and
winding .... P.t is step down
transformer hence in this also
no fuse is used .... Its was a
trick question to measure
your knowledge

Is This Answer Correct ?    5 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is different between Circuit breaker and Isolater?

1813


Where is the best place to mount  distribution panel in a house.

2097


Why negative feedback is preferred in the control system?

1261


how to synchronize 3 phase slip ring induction motors of different ratings.

2301


Why a Permanent Magnet Generator has higher frequency as compared to frequency of main alternator?

1991


WHAT SHOULD BE THE BEST CURRENT RATINGS (PRIMARY / SECONDARY)FOR A CT INSTALLED AT THE INCOMING 11KV PANE? WILL IT BE CALCULATED ON THE BASES OF MAXIMUM DEMANT VALUE OR ON SUM OF ALL TRANSFORMER'S KVA? NOMALLY MAX DEMAND REPRESENT THE MAXIMUM OPERATING LOAD OF THE PLANT AND TOTAL KVA OF (SAY 5 NUMBERS TRANSFORMERS) REPRESENT THE CONNECTED LOAD. WHICH i.e. MAX DEMAND KVA OR CONNECTED KVA ARE BETTER TO USE FOR CT CURRENT CALCULATION? PLEASE ANSWER.

1921


What is stacking factor? What is its approximate value?

1443


would you please give me any idea about the BARC interview question on electrical? i have an interview on 1st july.....plz hlp me.......its urgent......

2474


Why mostly the HV side of transformer has Delta?

3220


What happens if i apply 500V to 440V rotary Switch ?

1831


what is high and low cut off voltage of BB and DG at SPS????????

1475


DC transmission

2079


what is the VA(Volt-amphere)? define with calculation?

1285


Minimum IR value of 1.1 kv grade 3.5c (300, 240,185,150,120,95,70,50,35,25) sqmm Aluminium XLPE cable and 4c (16, 10,6 & 4) sqmm cu arm cable between RY,YB,BR,RN,YN,BN,RE,YE,BE & NE.

3346


typically in power distribution substation. 1- Any idea how would be the graph of capacitor bank consumption verses time through the day . 2- How is the switching ( on and off ) of the capacitor bank, per need?

1735