Answer Posted / harjit
there are total 27 MRP tyep:
that include MRP procedure:
1) NO mrp
2) forecast based
3)MPS planning
4)reorder point planning
| Is This Answer Correct ? | 19 Yes | 39 No |
Post New Answer View All Answers
What is the use of QM control key?
Where have we to specify the teardown time in one operation?
What is requirement class and requirement type?
In tm, if a group of employees gets 10 days of annual leave, what will be the time evaluation status?
What is the difference between pp and pp-pi? Which one is better and how ?
How requirements( pir,sles order, customer requirement) are reduced after they are produced?
What is planning file entry
What are the t-codes for creating, changing and summarizing bom?
Explain what happens to planned after it has been converted into production order?
What is the use of t-code cs20 in bom?
Explain what is sap pp?
What is mrp controller means?
What is the data you give in S.O.P screen?
Explain the process of Material costing.
• How are basic order dates determined?