Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

I have a question, I visit 01 site and face a problem,
there is 2.5 ton Air Con working, when air con compressor
is running at that time rectifier voltages are increasing
upto 290-295 v and rectifier is giving main high alarm
(rectifier is APC single phase), before starting compressor
rectifier voltages was 230v. when air con is going off
rectifier voltages are decreasing smoothly at its actual
voltages 230v.

Load on Genset phases is this: Red-13.5 amp AC (Air Con
load), Yellow-1.7 amp AC (BTS lights etc.) and Blew-4 amp
AC (telecom system load),
Genset phase to phase and neutral to phase voltages are
also ok.


These are 10 sites having same system and same rectifier
APC brand at every site 02 genset are working but the
problem is same at all these 10 sites.

What will be the reason behind???

Answer Posted / k.prakashchandra

Interchange the loads on the 3 phases

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is the difference between capacitive and resistive voltage divider?

3520


State the points to be considered for selecting a particular type wiring.

2060


What are the applications of autotransformers?

1077


WHat is the requirement of installing FAST ACTING EARTH SWITCH in GIS and how is that integrated with protection system. How and when does it operate?

2159


What is meant by short-pitched winding?

1197


If I want to lift the water at a height 50m from ground level through two inch(diameter) metal pipe then what is the capacity of motor pump is required? is it possible in single phase supply or not?

1891


Why temperature rise is conducted in bus bars and isolators?

1326


difference between power surge and switching transient

2080


what type of earthing do for dry fissure rock?

2430


If UG power cable both ends are to be earthed or what? If not why?

1936


Q.1:What protection will be used on HT and LT side of 33/0.4 KV, MVA transformer. Indicate capacities of protective device to be used. Q.2:Which types of back-up protections are used in the power transformers? What do you understand by the term over travel in the relay? Q.3:How star and delta connected winding transformer are provided from earth fault

2119


What must be the minimum distance maintained between 2 Generators as per International standards?

2130


A 7 storey building has a floor area of 35,000sq.ft on each storey. On the ground floor 11KV electrical sub-station is to be erected. A load of 3kw for every 400sq.ft (p.f is 0.8) is proposed for each floor. fire pump 7.5hp, water pump 5hp, lift 2 nos, each 10hp and 20shop load of each shop is 5kw. calculate a. load each floor b. total load of building c. L.T feeders for aech floor and from transformer to main. d. distribution diagram e. capacity of sub-station/capacitor bank f. line diagram

2811


What are the disadvantages of autotransformer?

1108


what is arc flash and what are the hazards involved

2149